Friday, September 14, 2012
© Copyright 2013
Gwinnett Daily Post
ATLANTA (AP) -- Authorities say preparation work to stabilize fencing on a bridge in midtown Atlanta has begun, just over a year after debris from the structure broke loose and rained down on motorists on a busy freeway below.
Massana Construction started working on the bridge this week. Full construction should occur in the next few weeks.
State officials have said problems with industrial glue led to heavy steel raining down from the bridge canopy last year. About 170 feet of aluminum fencing and canopy supports for a pedestrian walkway on the 17th Street Bridge crumbled above the main Downtown Connector on Aug. 13. The failure happened late at night, and no wrecks or injuries were reported.
More like this story
- Rocks, debris rain down on motorists from Kennesaw overpass ( August 28, 2012 )
- Atlanta bridge reopened after damaged by fire ( October 10, 2012 )
- State: Glue problems led to bridge canopy collapse ( January 20, 2012 )
- Hospital readies for expansion ( April 6, 2007 )
- Part of theater to be demolished ( April 13, 2010 )

Comments
Use the comment form below to begin a discussion about this content.
Sign in to comment
Or login with:
OpenID